Monday, March 30, 2015

Blower Door Test IRC

A blower door test at a pressure of 0.2 inches w.g. is required to be performed. Testing shall be conducted by an approved party and a written report of the results shall be signed and provided to the building official. Or the components of the building thermal envelope as listed in Table N1102.4.1.1 shall be installed and inspected as applicable to the method of construction.

Tuesday, March 10, 2015

Foundation Time

My Foundation is up over in Spanish Fork, just look at how well placed those anchor bolt are !!

Monday, March 2, 2015

Spring Training

The Beehive Chapter of ICC is having their Annual Spring Train this year in April to 20th - 22nd in Provo Utah. Great classes to get signed up early at our website www.beehiveicc.org