A blower door test at a pressure of 0.2 inches w.g. is
required to be performed. Testing shall be conducted by an approved party and a
written report of the results shall be signed and provided to the building
official. Or the components of the building thermal envelope as listed in Table
N1102.4.1.1 shall be installed and inspected as applicable to the method of
construction.
Monday, March 30, 2015
Tuesday, March 10, 2015
Monday, March 2, 2015
Spring Training
The Beehive Chapter of ICC is having their Annual Spring Train this year in April to 20th - 22nd in Provo Utah. Great classes to get signed up early at our website www.beehiveicc.org
Subscribe to:
Posts (Atom)