Tuesday, February 24, 2015

Trusses

Truss design drawings, the written, graphic and pictorial depiction of each individual truss shall be provided to the building official and approved prior to installation. IBC 2303.4.1.2

Have the engineer record review the truss specs for any loading, uplift or point loads that may be required. Also provide the hangers that are needed for truss to girder connections.

No comments:

Post a Comment