A blower door test at a pressure of 0.2 inches w.g. is
required to be performed. Testing shall be conducted by an approved party and a
written report of the results shall be signed and provided to the building
official. Or the components of the building thermal envelope as listed in Table
N1102.4.1.1 shall be installed and inspected as applicable to the method of
construction.
No comments:
Post a Comment